Muskeg Cabins Project 

Project included widening and grading of a 12.5 km section of Highway 40. Scope included the addition of passing lanes, installation of erosion control measures, installation of 2200 mm bridge file complete with traffic detour, culvert installation, smooth wall steel pipe via a case bore, existing slide repairs, and landscape construction.