Home Contact Sitemap login Checkout

Click for the BBB Business Review of this Road Building Contractorsin Edmonton AB

Norellco Contractiors Ltd.
  • Home
  • Company Profile
  • Safety
  • Projects
    • Projects
    • Road Building
      • Road Building
      • Lac La Biche
      • Berland
      • Muskeg Cabins
      • Pinto Creek
    • Grading
      • Grading
      • MTE
      • Century Park: Park and Ride
    • Storm Water Management Facilities
      • Storm Water Management Facilities
      • Goldbar Creek
      • Morris Wetland
      • Groat Road Storm Basin
      • Kennedale Wetland
      • Mill Creek River Outfall
    • Underground
      • Underground
      • Orchards Subdivision Sanitary Trunk Line
      • Aldergrove
      • LRT 16 Belgravia Bridge and Road
      • LRT 21 114 Street Storm Sewer
      • LRT 18 Belgravia Road Grading Separation
    • Slide Repair
      • Slide Repair
      • Argyll
      • Snow Valley Ski Hill
      • Whitemud Drive
    • Bridge Construction
      • Bridge Construction
      • Edmonton Foot Bridge
      • LRT 36 Century Park Pedway
      • LRT 34 111 Street Bridge
  • Employment
    • Employment
    • Apply Now
    • Opportunities
  • Affiliations
  • Awards
  • Contact Us
  • Documents
  • Road Building
  • Grading
  • Storm Water Management Facilities
  • Underground
  • Slide Repair
  • Bridge Construction
    • Edmonton Foot Bridge
    • LRT 36 Century Park Pedway
    • LRT 34 111 Street Bridge
Home/Projects/Bridge Construction/Edmonton Foot Bridge Print This Page
During Construction (1)

During Construction (1)

During Construction (2)

During Construction (2)

During Construction (3)

During Construction (3)

During Construction (4)

During Construction (4)

During Construction (5)

During Construction (5)

During Construction (6)

During Construction (6)

During Construction (7)

During Construction (7)

During Construction (8)

During Construction (8)

During Construction (9)

During Construction (9)

During Construction (10)

During Construction (10)

During Construction (11)

During Construction (11)

During Construction (12)

During Construction (12)

During Construction (13)

During Construction (13)

Post Construction

Post Construction

   

 

Edmonton Foot Bridge Project

 

Norellco was one of the companies that worked on the Edmonton Foot Bridge in 2008. Norellco was responsible for the earthwork in the river for the bridge supports. This project was unique since earth berms had to be created to reach each location in the river before the supports were built; the area where the supports were placed had to have room for equipment to access it. Norellco extended the river bank to reach these locations and also removed it once the bridge was complete. The bridge is located just south of Fort Edmonton crossing over the North Saskatchewan River. The bridge can be accessed by a path that runs along the river.

Contact Us

Norellco Contractors Ltd.

1002 - 17 Avenue

Nisku, Alberta T9E 0G5


Copyright 2014 Norellco Contractors Ltd.

Designed by Norellco Contractors Ltd. using ShoutCMS

Privacy Policy