Home Contact Sitemap login Checkout

Click for the BBB Business Review of this Road Building Contractorsin Edmonton AB

Norellco Contractiors Ltd.
  • Home
  • Company Profile
  • Safety
  • Projects
    • Projects
    • Road Building
      • Road Building
      • Lac La Biche
      • Berland
      • Muskeg Cabins
      • Pinto Creek
    • Grading
      • Grading
      • MTE
      • Century Park: Park and Ride
    • Storm Water Management Facilities
      • Storm Water Management Facilities
      • Goldbar Creek
      • Morris Wetland
      • Groat Road Storm Basin
      • Kennedale Wetland
      • Mill Creek River Outfall
    • Underground
      • Underground
      • Orchards Subdivision Sanitary Trunk Line
      • Aldergrove
      • LRT 16 Belgravia Bridge and Road
      • LRT 21 114 Street Storm Sewer
      • LRT 18 Belgravia Road Grading Separation
    • Slide Repair
      • Slide Repair
      • Argyll
      • Snow Valley Ski Hill
      • Whitemud Drive
    • Bridge Construction
      • Bridge Construction
      • Edmonton Foot Bridge
      • LRT 36 Century Park Pedway
      • LRT 34 111 Street Bridge
  • Employment
    • Employment
    • Apply Now
    • Opportunities
  • Affiliations
  • Awards
  • Contact Us
  • Documents
  • Road Building
  • Grading
  • Storm Water Management Facilities
    • Goldbar Creek
    • Morris Wetland
    • Groat Road Storm Basin
    • Kennedale Wetland
    • Mill Creek River Outfall
  • Underground
  • Slide Repair
  • Bridge Construction
Home/Projects/Storm Water Management Facilities/Morris Wetland Print This Page
Pre-Construction (1)

Pre-Construction (1)

Pre-Construction (2)

Pre-Construction (2)

Pre-Construction (3)

Pre-Construction (3)

During Construction (1)

During Construction (1)

During Construction (2)

During Construction (2)

During Construction (3)

During Construction (3)

During Construction (4)

During Construction (4)

During Construction (5)

During Construction (5)

During Construction (6)

During Construction (6)

During Construction (7)

During Construction (7)

During Construction (8)

During Construction (8)

During Construction (9)

During Construction (9)

During Construction (10)

During Construction (10)

During Construction (11)

During Construction (11)

During Construction (12)

During Construction (12)

During Construction (13)

During Construction (13)

During Construction (14)

During Construction (14)

During Construction (15)

During Construction (15)

During Construction (16)

During Construction (16)

Post Construction (1)

Post Construction (1)

Post Construction (2)

Post Construction (2)

Post Construction (3)

Post Construction (3)

Post Construction (4)

Post Construction (4)

Post Construction (5)

Post Construction (5)

Post Construction (6)

Post Construction (6)

Post Construction (7)

Post Construction (7)

Post Construction (8)

Post Construction (8)

Post Construction (9)

Post Construction (9)

 

Morris Wetland & Storm Water Management Project

 

Norellco began work at Morris Wetland in 2011. The first part of this project was removing any scrap metal was present on the site, identifying, clearing and removing contaminated soil and water. 

 

Once the site contamination was dealt with, ponds were constructed to allow for improved drainage in the area, and berms were constructed to make the site accessible for ongoing water monitoring. Pipes have been installed between ponds to allow for overflow, and to filter the water to improve the quality of water draining into Goldbar Creek which eventually drains into the North Saskatchewan River. 

 

Morris Wetland is located on 34 Street  just North of the Sherwood Park Freeway. 

Contact Us

Norellco Contractors Ltd.

1002 - 17 Avenue

Nisku, Alberta T9E 0G5


Copyright 2014 Norellco Contractors Ltd.

Designed by Norellco Contractors Ltd. using ShoutCMS

Privacy Policy