Home Contact Sitemap login Checkout

Click for the BBB Business Review of this Road Building Contractorsin Edmonton AB

Norellco Contractiors Ltd.
  • Home
  • Company Profile
  • Safety
  • Projects
    • Projects
    • Road Building
      • Road Building
      • Lac La Biche
      • Berland
      • Muskeg Cabins
      • Pinto Creek
    • Grading
      • Grading
      • MTE
      • Century Park: Park and Ride
    • Storm Water Management Facilities
      • Storm Water Management Facilities
      • Goldbar Creek
      • Morris Wetland
      • Groat Road Storm Basin
      • Kennedale Wetland
      • Mill Creek River Outfall
    • Underground
      • Underground
      • Orchards Subdivision Sanitary Trunk Line
      • Aldergrove
      • LRT 16 Belgravia Bridge and Road
      • LRT 21 114 Street Storm Sewer
      • LRT 18 Belgravia Road Grading Separation
    • Slide Repair
      • Slide Repair
      • Argyll
      • Snow Valley Ski Hill
      • Whitemud Drive
    • Bridge Construction
      • Bridge Construction
      • Edmonton Foot Bridge
      • LRT 36 Century Park Pedway
      • LRT 34 111 Street Bridge
  • Employment
    • Employment
    • Apply Now
    • Opportunities
  • Affiliations
  • Awards
  • Contact Us
  • Documents
  • Road Building
  • Grading
  • Storm Water Management Facilities
    • Goldbar Creek
    • Morris Wetland
    • Groat Road Storm Basin
    • Kennedale Wetland
    • Mill Creek River Outfall
  • Underground
  • Slide Repair
  • Bridge Construction
Home/Projects/Storm Water Management Facilities/Groat Road Storm Basin Print This Page
Pre-Construction (1)

Pre-Construction (1)

Pre-Construction (2)

Pre-Construction (2)

Pre-Construction (3)

Pre-Construction (3)

Pre-Construction (4)

Pre-Construction (4)

Pre-Construction (5)

Pre-Construction (5)

During Construction (1)

During Construction (1)

During Construction (2)

During Construction (2)

During Construction (3)

During Construction (3)

During Construction (4)

During Construction (4)

During Construction (5)

During Construction (5)

During Construction (6)

During Construction (6)

During Construction (7)

During Construction (7)

During Construction (8)

During Construction (8)

During Construction (9)

During Construction (9)

During Construction (10)

During Construction (10)

During Construction (11)

During Construction (11)

During Construction (12)

During Construction (12)

During Construction (13)

During Construction (13)

During Construction (14)

During Construction (14)

During Construction (15)

During Construction (15)

During Construction (16)

During Construction (16)

Post Construction (1)

Post Construction (1)

Post Construction (2)

Post Construction (2)

Post Construction (3)

Post Construction (3)

Post Construction (4)

Post Construction (4)

Post Construction (5)

Post Construction (5)

Post Construction (6)

Post Construction (6)

Post Construction (7)

Post Construction (7)

Post Construction (8)

Post Construction (8)

Post Construction (9)

Post Construction (9)

Post Construction (10)

Post Construction (10)

Post Construction (11)

Post Construction (11)

 

Groat Road Storm Basin Project

 

The purpose behind the Groat road storm basin is to improve the quality of water draining into the North Saskatchewan River from the City of Edmonton's Drainage Systems.

 

Nocrellco began the job in November 2010 and was completed in 2011. The job included stripping the area, installing treatment units for the storm water, culverts and pipes to allow for draining, and storm filters. The storm basin is located on the North side of the North Saskatchewan River, West of the Groat road bridge

Contact Us

Norellco Contractors Ltd.

1002 - 17 Avenue

Nisku, Alberta T9E 0G5


Copyright 2014 Norellco Contractors Ltd.

Designed by Norellco Contractors Ltd. using ShoutCMS

Privacy Policy